|
|
 |
|
Home :: Vessel Science & Operations :: Polar Research Vessel :: Feedback Form
Polar Research Vessel (PRV) Feedback Form
The PRV Feedback site is in direct correlation with the New-Generation PRV
project. All stakeholders who have a vested interest in the development of the ship that will replace the
R/V Nathaniel B. Palmer are encouraged to use this forum for providing feedback relating to
science and technical requirements.
The five most recent Comments are featured below. Click on a Comment subject to view the
details about that Comment, or click on a column header when highlighted to sort all Comments
by that column.
Date Added | Name | Subject |
Comment |
| 1/11/2007 02:42 PM |
Marc Pomeroy |
Laboratory Safety Equipment |
The vessel labratory environmental safety controls (Fume hoods, safety eyewashes, safety showers, ventillation, etc.) should be held to the current OS... |
| 8/15/2006 03:00 PM |
Stephanie Suhr |
mud working space |
incorporate an 'aquarium room' type space near the backdeck (as straight a shot as possible) that doesn't just function as an aquarium (with modular t... |
| 8/15/2006 02:54 PM |
Stephanie Suhr Sliester |
trace metal clean water sampling |
for efficient trace metal clean sampling, it should be a straight shot from the starboard a-frame into the closest 'wet' lab, so that TMC rosettes cou... |
| 8/15/2006 02:52 PM |
Stephanie Suhr Sliester |
seawater incubations / helo deck |
for seawater incubations on the helo deck, this needs to be unshaded and should be heated, so in case of spillage the deck does not get icy.... |
| 7/18/2006 09:22 AM |
Marc Pomeroy |
phone / ship alarm systems |
The phone and ship alarm systems should include enough spare ports to accommodate alarm and phones to all science laboratory vans, grantee vans, or ot... |
|
|
|
|
|